Great Lakes Coca-Cola Bottling
Location
Eagan, MN
Industry
Food & Beverage
Services
Architecture, Construction Administration, Due Diligence
About the Project
This 80,000-square-foot beverage manufacturing and distribution facility expansion modernizes operations with a nearly 79,000-square-foot warehouse and 23 dock positions equipped with centralized dock systems. The facility features extensive battery charging capacity, mezzanine-level employee spaces, and specialized areas such as a concentrate cooler with dedicated containment, all supported by insulated precast construction for efficient, high-volume production and distribution.






